Skip to Navigation
Skip to Content

Frequently Asked Questions - assessing

Why do you do investigations for a retaining wall before you rebuild it?
Printer-friendly version

To undertake the design of the wall SCIRT first needs to determine the ground conditions around and beneath the proposed wall through geotechnical investigations. These investigations along with information on the location and condition of adjacent services are used to determine the extent of the design and possible rebuild solutions.