Skip to Navigation
Skip to Content

Dundas Street - Central city - Wastewater lateral repair

Printer-friendly version
What
Repairing a wastewater lateral.
Where
Dundas Street, Central City.
When
Starting Thursday 19 January 2017, for about two days.

Map 1: Location of work—indicative only. Traffic flow (black arrows): eastwards along Dundas Street (passing 31), and westwards along Dundas Street (opposite 31 passing the northern side of the worksite); Access point (red disc) and worksite (purple): southern side of Dundas Street (at Pak'nSave, opposite 31); No parking (orange dashed): northern side of Dundas Street (at 31), southern side of Dundas Street (southern side of the worksite); Stop/go (red/green): Dundas Street (adjacent to 31).
Sourced from LINZ data, Crown Copyright reserved.

What we are doing

  • Downer, as part of SCIRT, is repairing the earthquake damaged wastewater system in Sydenham.
  • Starting Thursday 19 January 2017, we will be repairing a wastewater lateral outside 31 Dundas Street.
  • This work will take two days to complete, subject to favourable on-site and weather conditions.
  • A lateral is the pipe that connects a property to the mainline in the street. We will need to dig a small trench near the middle of the road to access and repair the damaged pipe. See Map 1 for location of works.
  • Once the connection is repaired we will backfill the access point. The trench will then be sealed by a separate roading crew.

Traffic impacts

  • Two-way traffic will be maintained on Dundas Street using a stop-go system.
  • To create a safe work area for the crew and to maintain two-way traffic there will be a reduction in available car parks.
  • Please use alternative parking during this time. We apologise for any inconvenience.
  • Our standard hours of work are 7:00am–6:00pm.
  • We appreciate your cooperation and patience while we complete these essential repairs.
  • There may be an increased level of noise, dust and vibration levels associated with this work. We will do our best to keep disruption to a minimum.
  • We appreciate your patience and cooperation while we complete these essential repairs.

Need more information?

Contact Downer on 0800 400 310 or [email protected]

Start date: 
Thu, 19/01/2017
Project numbers: 
11139