Skip to Navigation
Skip to Content

Breezes Road - Aranui - road surface maintenance - Traffic Alert

Printer-friendly version
This note is to advise you that the road surface maintenance work is scheduled to start on Thursday 19 January 2017 and we anticipate that all the work will be completed by the end of the month. Please keep in mind that our timeframes are subject to favourable weather and on-site conditions. All general and safety information remains the same.

This notice is an update for an earlier notice.

Traffic impact

During the road surface maintenance work, a one-way traffic system heading northbound towards Wainoni Road will be in place. See Map 1.

The signed detour route will be via Shortland Street, please be on the lookout for our traffic signage and please drive to the conditions.

When the work is outside your property, access to your driveway may be limited for a few hours at a time. Please take extra care when exiting your driveway and ensure you travel in the correct direction.

  • Talk to us at Fletcher on 0800 444 919
  • Contact us

Map 1: Location of work. Area of work (yellow): Breezes Road (between Gosport Street and Hampshire Street, and between Hampshire Street and 239; 239 is southeast from the intersection with Hampshire Street); One-way traffic (blue arrow): northwestwards along Breezes Road (from 239 to and through the areas of work, including through the intersection with Hampshire Street, to the intersection with Gosport Street); Fletcher Infrastructure, on behalf of SCIRT, would like to take this opportunity to thank the residents, for your patience, support and co-operation while this work is underway in your street.
Sourced from LINZ data, Crown Copyright reserved.
Thanks | Kia Ora | Fa'afetai.

Start date: 
Thu, 19/01/2017
Project numbers: 
11074