Works overview in New Brighton - wastewater and fresh water

An updated overview for New Brighton can be found here
Related works notices
Keyes Road – New Brighton – Wastewater main replacement
Keyes Road - New Brighton – Wastewater
Keyes Road - New Brighton – Fresh water
Rawson Street -New Brighton - wastewater renewal
Marriotts Road - New Brighton - Wastewater replacement
Woodgrove Avenue – New Brighton – Gravity wastewater replacement
Bowhill Road - New Brighton - wastewater
Keyes Road and Bowhill Road - New Brighton - Wastewater
Keyes Road and Bowhill Road - New Brighton - Wastewater pump station
Sinclair Street - New Brighton - Wastewater replacement, Stage one and Stage two
Leaver Terrace - New Brighton - Wastewater replacement
Palmers Lane - New Brighton - Wastewater replacement
Palmer Road - New Brighton - Wastewater replacement
What pipes are under the road?
There are many essential services located underground, below the surface of the road. The number, size, and the depth of the pipes varies from street to street. Often the services under the road include:
- Fresh water pipes
- Stormwater pipes
- Wastewater pipes
- There are also ducts for cables such as telecommunication and power
We may need to repair more than one pipe in a section of the road. We we have a ‘dig once’ policy, in some cases, we cannot have two crews in the same trench, or the pipes are under different sides of the road and we will need to return to a street more than once. The road surface will be repaired last, after all of the underground infrastructure
has been repaired.

Impact on other services?
- We don’t expect for our work on the wastewater pipes to impact other services, like the fresh water main.
- However, the network is still fragile so please be prepared in case there is an unexpected service cut off.
Need more information?
Phone: 0800 277 34 34 (7.30am- 5.00pm Monday - Friday)
Email: rebuildinfo@fultonhogan.com