In addition to roads, fresh water, wastewater, and storm water, we're rebuilding some other horizontal infrastructure that the people of Christchurch need in working order. These include, but are not limited to:

  • retaining walls
  • stopbanks
  • bridges
  • footbridges

If these features are damaged alongside a damaged roadway, they are likely to be rebuilt as part of the road rebuilding. For example, a footbridge running next to a roadway would be rebuilt as part of the road project.

We treat features like reservoirs as part of the fresh water system. We consider road bridges, footpaths, bikeways, berms, kerbs, and channels as part of the roadway, and they are rebuilt at the same time.

What exactly is this other infrastructure?

A retaining wall is a structural wall which is built to support land mass and structures. In Lyttelton, the numerous historic red brick (or red scoria rock) retaining walls were mostly built by prisoners.

Stopbanks are structures which prevent rivers, creeks, and estuaries from overflowing their banks onto nearby land. These are particularly important in urban areas to stop waterways from flooding properties. Suburbs around the Avon River in the inner Eastern suburbs are particularly reliant on effective stopbanks.

Work underway on other infrastructure

Starting Work Description
19 Oct 2015 Glenstrae Road - Redcliffs - Slope Stabilisation
19 Oct 2015 Moncks Spur Road - Glenstrae Road - Redcliffs - Slope stabilisation and construction of new retaining walls *Update* 1
19 Oct 2015 Radley Street - Woolston - bridge repair
15 Oct 2015 Antigua footbridge - Central city - Final work and night closure
13 Oct 2015 St Davids Street - Lyttelton - retaining wall repairs *Update*
5 Oct 2015 Sumner Road - Lyttelton - retaining wall repairs - stage three
5 Oct 2015 Beckford Road - St Martins - Bridge repair
5 Oct 2015 Moncks Spur Road - Redcliffs - Retaining wall repair - Overview
28 Sep 2015 St Davids Street - Lyttelton - retaining wall repairs *Update*
21 Sep 2015 Carlton Mill and Helmores Lane - Merivale / Central city - Bridges *Update*
21 Sep 2015 Ensors Road - Opawa - Bridge repair
16 Sep 2015 Malcolm Avenue - Beckenham / Huntsbury - Footbridge repair
14 Sep 2015 Jacksons Road - Lyttelton - retaining wall repairs
14 Sep 2015 Mt Pleasant Road - Mt Pleasant - Retaining Wall
11 Sep 2015 St Andrews Hill Road - Mount Pleasant - Retaining Wall - End
4 Sep 2015 Jacksons Road - Lyttelton - retaining wall repairs *Update*
2 Sep 2015 Heberden Avenue - Sumner - retaining wall *Update*
31 Aug 2015 Beachville Road - Redcliffs - Seawall repair
25 Aug 2015 St Davids Street - Lyttelton - retaining wall repairs *Update*
24 Aug 2015 Helmores Lane Bridge - Merivale - bridge repairs - Overview
17 Aug 2015 Beachville Road - Redcliffs - Seawall repair - coastal pathway - road reconstruction and storm water repairs - Overview
3 Aug 2015 Marine Drive - Charteris Bay - Retaining wall renewal - Project Overview
29 Jul 2015 Taylors Mistake Road - Sumner - retaining wall *Update*
28 Jul 2015 Heberden Avenue - Sumner - retaining wall *Update*
27 Jul 2015 St Davids Street - Lyttelton - retaining wall repairs
27 Jul 2015 Station Road - Heathcote Valley - Retaining wall
27 Jul 2015 Rapanui Ridge - Redcliffs - Retaining wall repair
22 Jul 2015 Avonside Drive - Linwood - Repairs to the earthquake damaged retaining walls - Traffic *Update*
20 Jul 2015 Vivian Street - Burwood - patch kerb, road and footpath repairs *Update*
13 Jul 2015 Avonside Drive - Linwood - retaining wall repairs